All projects
InstitutionalMachakos County · 2025
Machakos School Water Project
165 m
Depth
8 m³/hr
Yield
900
Students served
Borehole, treatment skid and elevated tank giving 900 boarding students clean drinking water on site.
Raw water at this site carried elevated fluoride, so Majitech paired the 165 m borehole with a treatment skid combining activated alumina and UV disinfection. A 12 m steel tower and 20,000-litre tank now gravity-feed the dormitories, kitchen and ablution blocks.
Project gallery
On-site photos
Images from survey, drilling and handover.
